Gold Coast Arts Centre – Chiller Upgrade

Client: 
Gold Coast City Council
Description of Works Carried Out: 

This project involved the supply and installation of replacement chillers to the above facility. The project included:  

~       Decommissioning and removal of existing air cooled chillers.

~       Supply and installation of Chilled Water System incorporating:

o   Two new 600kW Air Cooled Chillers with variable speed drive screw compressors

o   Chilled Water Pumps with VSD control

o   Chilled Water Reticulation Modifications

~       Upgrade of Mechanical Switchboards and controls to operate the above plant and equipment.
 
~       Coordination with GCCC. System Air engaged as head contractor on this project.

~       Cranage and traffic control as required to position plant and equipment.

NEBB Certified Commissioning of the completed systems.